Forum Discussion

Jeff_Jones_4404's avatar
Jeff_Jones_4404
Icon for Nimbostratus rankNimbostratus
Jul 25, 2012

iRule switching when one site is in maintance mode

is it possible via a script or a cron job to allow for switching iRules on and off based on a maintance schedule from one site to another.

 

 

JJ

 

5 Replies

  • Hamish's avatar
    Hamish
    Icon for Cirrocumulus rankCirrocumulus
    Yeah. You can do what you like externally and the use an iControl connection to alter the iRules on a VS... That will only affect new connections though, not established ones.

     

     

    Failing that, you could use an in-memory table (Or an iFile probably in v11) to hold the status and use a quick check at the beginning of the iRule event to decide whether to run or just return...

     

     

    H
  • Thanks, now the fun part figure out how to do it, not yet running v11,

     

     

    basically have a site that has a maintance window, so want to remove it , let maintance happen, then put it back.

     

     

    JJ
  • you can also assign and remove iRules with 'tmsh modify ltm virtual rules'
  • bah. content scrubber ate part of my post. in between "virtual" and "rules" you would put the VIP name.
  • Hamish's suggestion for using an iControl script would probably be the most efficient method. Else, you could also track the current time in the iRule itself and only take a maintenance action during the specific time window(s). Here's an article with examples:

     

     

    Scheduled Maintenance Window

     

    https://devcentral.f5.com/Community/GroupDetails/tabid/1082223/asg/50/aft/29608/showtab/groupforums/Default.aspx1250581

     

     

    And for the full gory detail:

     

     

    Scheduled Maintenance Window

     

    https://devcentral.f5.com/Forums/tabid/53/aft/29608/Default.aspx

     

     

    Aaron